Overview

A good plan fits your real day: meetings, working hours, and the work that matters most. Focus builds that plan on a timeline so you can see what fits before the day starts.

Who can do this

  • Required access: an access level that includes AI - Access.
  • Default access levels that include it: Team Member, Accountant, and System Administrator.
  • Owners and admins: always allowed. Workspace owners and admins are not limited by access levels.
  • Focus shows work you can already open: tasks need Tasks - Standard Access (or higher) and tickets need Tickets access.
  • Each request to Benny (Plan my day, Replan, Prepare my day, More work, Reshuffle) uses 2 AI credits.
  • Personal accounts: Not available. This is a work feature, so it is hidden in personal (family) spaces.

Owners and admins review and change access levels in Settings → Administration → Members → Access levels.

Step 1: Open Focus

  1. Open Calendar and switch to the Day view.
  2. Use the seven-day strip to pick another day if you're planning ahead. Today brings you back.

Step 2: Let Benny plan the day

  1. On an empty day, choose Plan my day.
  2. Optionally click Add a note and answer Anything to keep in mind?, such as "Client review at 2; finish the Acme proposal first."
  3. Benny places your most important work into open time, keeping your calendar events free.
  4. Review the result. If you change your mind, click Replan to see Benny's summary, anything that didn't fit, and Replan open time.

Step 3: Or build it yourself

  1. Drag items from Your work onto the timeline, or click an item and choose Add at next free slot. Add another session adds a second 30-minute block for the same item.
  2. Click a gap on the timeline, or Add block, to create a block. Choose a task, a Custom block, or a Break, set Start and End (or a 15, 30, 60, or 90 minute duration), and click Add to schedule.
  3. Drag blocks to move them, and pull their edges to resize.

Changes save automatically. You'll see "Saving…" and then "Saved".

Tip: If the header says Calendar needs a refresh, click Refresh calendar before planning so Benny works around your latest meetings.


Troubleshooting

IssueWhat to check
Something is missing from Your work.Your work lists items assigned to you, plus items you logged time on in the last two weeks. Assign the task to yourself or search with Find work….
Blocks overlap meetings.The status strip counts overlaps. Move the blocks, or turn on Show calendar in day settings.
You can't edit a day.Past days are read-only.