Overview

The Updates tab on My Work is your activity inbox: missed comments, mentions, status changes, and other notifications, shown where you already work instead of only behind the notification bell. It is organized into lanes — items that need action, mentions of you, and everything else — so you can triage top-down.

Who can do this

  • Everyone: Everyone has their own Updates inbox.
  • Personal accounts: Everyone in the space can do this, including Limited Members.

Open your updates

  1. Go to My Work.
  2. Select the Updates tab in the segmented control next to All, Tasks, and Tickets. An unread count on the tab tells you what is waiting before you click.
  3. Read down the lanes: action-required items first, then mentions, then the rest.

Act on an update

  1. Click an update to jump straight to the underlying record. A comment update opens the item with that comment in view, so you can reply without hunting for it.
  2. Opening an update marks it read automatically.
  3. Use mark all read to clear the unread state at once, or dismiss a lane when you have handled it.

You will also see unread dots on rows in the main My Work lists when a task or ticket has activity you have not seen yet — opening the item clears the dot.

Why am I seeing updates for this item?

Updates cover work you are involved in or follow:

  • Assignment — items assigned to you notify you about comments, status changes, and completion.
  • Participation — commenting on a task, or being mentioned in one, makes you a follower automatically.
  • Explicit follow — use the Follow control on a task's detail view to watch work you are not assigned to. Unfollow the same way when you no longer need the updates.

Best practice: sweep the Updates tab once in the morning and once after lunch. The lanes mean you can safely dismiss the bottom of the list once the action-required lane is empty.


Troubleshooting

ProblemTry this
You expected an update about a task but never got one.Check that you are assigned to it or following it — open the task and look at the Follow control.
Too many updates from one item.Unfollow it from the task's detail view; assignment-based updates continue only while you are assigned.
An update points at something already handled.Some reminders resolve themselves when the underlying work changes; dismiss anything left over.

Next steps