Overview

Contractor setup usually needs two sides of rate information: what you charge the client and what the contractor costs your business. Those values can be the same, but they often are not.

A contractor can have a client-facing bill rate, a contractor pay rate, and an internal cost rate. Scrambl uses the bill rate for revenue and the pay or cost rate for margin, profitability, budgets, and forecasts.

Minimum setup: Every billable contractor needs a bill rate path. If you want margin reporting, they also need pay or cost information.

Who can do this

  • Required access: an access level that includes Profitability - Full Access.
  • Default access levels that include it: Accountant and System Administrator.
  • Owners and admins: always allowed. Workspace owners and admins are not limited by access levels.
  • Rates are configured in Profitability, so this needs Profitability - Full Access. Profitability - Standard Access can view rates but not change them.
  • Personal accounts: Not available. This is a work feature, so it is hidden in personal (family) spaces.

Owners and admins review and change access levels in Settings → Administration → Members → Access levels.

Choose the simplest setup

Contractor patternUseWhy
The contractor always bills at one rate.Member default bill rate.Fastest setup and easiest to audit.
The contractor bills differently by client.Client-specific member rate or client rate card.Use a member rate for a person-specific deal; use a rate card for standard role pricing.
The contractor bills differently by project.Project-specific member rate or project rate card.Best when a project has special pricing or a negotiated project rate.
The contractor has occasional exceptions.Task or project member override.Keeps normal pricing intact while handling the exception.

Set up a contractor with a default rate

  1. Open Profitability → Settings → Rates → Rates.
  2. Find the contractor and open their rate details.
  3. Add a default bill rate for the amount clients should be charged when no more specific rate applies.
  4. Add the contractor's pay or cost rate if your team tracks margin.
  5. Set the effective start date to the date the rate should begin.
  6. Save, then review a billable time entry or forecast item to confirm the bill and cost sides resolve as expected.

Set up a contractor with role-based pricing

  1. Create the relevant job role in Profitability → Settings → Rates → Roles.
  2. Assign the org-level role to the contractor.
  3. Create or update the client or project rate card with that role and bill rate.
  4. Attach the rate card to the client or project.
  5. Add the contractor to the client or project billing roster and select the matching billing role.
  6. Add the contractor's pay or cost rate separately if margin should be calculated from contractor cost.

Bill rate vs pay or cost rate

RateUsed forContractor example
Bill rateRevenue and client billing.Acme Co is charged $150/hr for Alex's billable design work.
Pay rateWhat the contractor is paid.Alex is paid $90/hr for approved billable hours.
Cost rateInternal cost used for margin.Your team may use $95/hr if the contractor has additional internal costs.

If only the bill rate exists, Scrambl can calculate revenue but may not have enough information to calculate margin. If only the pay or cost rate exists, Scrambl can understand cost but still needs a bill rate path for billable work.

Troubleshooting

ProblemHow to fix it
The contractor's billable work has no bill rate.Add a member default bill rate, assign a matching billing role on a client or project with a rate card, or create a client/project member override.
Revenue appears, but margin is blank.Add a pay or cost rate for the contractor.
The contractor uses the rate card amount instead of their negotiated rate.Add a member-specific client or project override for the negotiated exception.
The contractor uses an old rate.Review effective dates and expire the old rate before the new rate begins.