Overview

When a member's rate looks wrong, the cause is usually one of four things: the expected rate is not configured, the member is not assigned to the right billing role, a more specific override is taking priority, or the expected rate is outside its effective date range.

Troubleshooting is easiest when you separate three questions: what should the client be billed, what should the member be paid, and what internal cost should Scrambl use for margin.

Who can do this

  • Required access: an access level that includes Profitability - Standard Access or Profitability - Full Access.
  • Default access levels that include it: Accountant and System Administrator.
  • Owners and admins: always allowed. Workspace owners and admins are not limited by access levels.
  • Viewing rates needs Profitability access; fixing them needs Profitability - Full Access.
  • Personal accounts: Not available. This is a work feature, so it is hidden in personal (family) spaces.

Owners and admins review and change access levels in Settings → Administration → Members → Access levels.

Start with the rate type

What looks wrongStart hereWhy
The client charge is wrong.Bill rate setup.Bill rates come from member defaults, role defaults, rate cards, or member-specific overrides.
Margin is wrong or blank.Pay and cost setup.Margin needs internal cost. W-2 employees often derive cost from compensation; contractors often need direct pay or cost values.
A rate card appears eligible but not assigned.Billing-role assignment.Eligibility means the member has a matching org-level role. Assignment requires a matching client or project billing role.
Old work used an old rate.Effective dates.Time entries usually resolve using the rate active for the work date.

Check the effective-rate path

  1. Open the member's rate details from Profitability → Settings → Rates → Rates, or from their page in Team → People → Pay → Rates.
  2. Find the client, project, role, task, and work date for the time entry or forecast item you are checking.
  3. Look for the most specific matching rate first: task-specific rates, then project-specific member or role rates, then project rate cards, then client-specific rates or client rate cards, then member or organization defaults.
  4. If the rate card should apply, confirm the client or project has the card attached.
  5. Confirm the card includes an entry for the member's billing role.
  6. Confirm the member is assigned that billing role on the client or project, or that the project inherits billing roles from the client.
  7. Check the rate's effective start and end dates against the work date.

Common symptoms and fixes

SymptomLikely causeHow to fix it
The member is eligible for a rate card but not assigned.The member has the org-level role, but not the matching client or project billing role.Add the member to the client or project billing roster and select the matching billing role.
The project uses the wrong client rate.The project may be inheriting client pricing, or it may have its own project card or override.Open the project's rate settings. Keep inheritance if the client rate should apply, or attach the correct project rate card if this project has special pricing.
The rate card is correct, but Scrambl uses a different amount.A more specific member override may be taking priority.Review project, role, and task-specific overrides for that member. Remove or expire the override if the standard card should apply.
The rate is missing for one role.The rate card does not include that role.Add the missing role entry to the rate card, or assign the member a billing role that already exists on the card.
Margin looks blank for a W-2 employee.Compensation or cost assumptions may be missing.Add or review the employee's compensation details, then confirm the work also has a bill rate path.
Margin looks blank for a contractor.The contractor may have a bill rate but no pay or cost rate.Add the contractor's pay or cost rate so Scrambl can calculate internal cost.
Past time still shows the old rate.The work date falls inside the old rate's effective period.Check the effective dates. If the old rate ended on the wrong date, adjust the end date and create the new rate with the correct start date.

Example

Alex logs billable time on Website Redesign for Acme Co. You expected $150/hr from the Standard Services rate card, but the effective rate shows $120/hr. The first thing to check is whether Alex has a project-specific override for Website Redesign. If that override exists and should no longer apply, expire it or remove it, then confirm Alex is assigned to the matching billing role for the project or the inherited client billing roster.